Bathroom Remodel

This is a bathroom remodel we did in 2010.  The tub surround had been leaking for a period of time causing mold to grow behind.  We removed the tub and surround.  Next, we sprayed the raw 2 x 4s with bleach and then with Kilz primer to lock out the mold.  Then, it was olny a matter of installing a new tub and doing some minor sheetrock and painting

City and State: 
Helena, MT
Completed: 
June, 2010
Project Value: 
$3500.00